A swimmingpool is on its way. Work will begin in September 2017 and is expected to be finished before November 2017.

The beautiful view from the terrace with Dramont in the background
The beautiful view from the terrace with Dramont in the background
The villa in 2 levels, seen from south.

A swimmingpool is under construction.
The villa in 2 levels, seen from south. A swimmingpool is under construction.